steel structure farm broiler poultry shed construction design chicken house

FOB Reference Price:Get Latest Price
US $15.5-30 / Square Meter | 100 Square Meter/Square Meters (Min. Order)
Supply Ability:
3500 Square Meter/Square Meters per Quarter steel structure farm broiler poultry shed construction design
Port:
TIANJIN
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Henan, China (Mainland)
Brand Name:
canglong
Model Number:
light steel structure chicken house
Material:
Steel
Use:
Carport, Hotel, House, Office, Sentry Box,Guard House, Shop, Toilet, Villa, Warehouse, Workshop,Plant
Main steel structure:
H type column,Z type purlin,C type purlin
Manufacturing Technology:
Drilling, Cutting, Assemblaging, Welding, Rectification, Testing etc.
Surface modification:
Ball Blasting, Painting, Hot-dip Galvanizing
steel Welding Testing:
Ultrasonic Testing, X-ray Testing
steel Welding Technology:
SAW, Carbon Dioxide Arc Welding
Wall & Roof:
EPS sandwich panels
Slop of roof:
Double or single
Window:
Aluminum alloy or plastic steel
Product:
easy and quick assembly prefabricated house
Structure:
Hot Galvanized Steel Structure
Packaging & Delivery
Packaging Details
steel structure farm broiler poultry shed construction design chicken house
,According to container size,container of 20 feet:Inside capacity is 5.69m x 2.34m x 2.18m,Gross weight of allocation is generally 17.5 ton,volumn is 24-26m3. container of 40 feet:Inside capacity is 11.8m x 2.34m x 2.18m,Gross weight of allocation is generally 22 ton,volumn is 54m3. HC container of 45 feet:Inside capacity is 13.58m x 2.34m x 2.71m,Gross weight of allocation is generally 29 ton,volumn is 86m3.
Delivery Time
Shipped in 19 days after payment

steel structure farm broiler poultry shed construction design chicken house

Company Information

     Cang Long Group was established in 2003.Our group owns the international market department, the domestic market department, the R &D department and tow group modernized Processing Center, covering the area reaches 450000 square meters, the production plant covering 228000 square meters. Products covering light steel structure, heavy steel structures, various models of color steel plate,meal deck, foam composite panels, rock wool composite panels,purification plates, C/Z steel, PU panels, purification plant, assembled concrete residential, light steel villas, container houses and other green building materials.At present, our products have been exported to more than 70 countries in the world, and have been widely recognized.

 

 

Steel Structure Building Description:

main steel frame
H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe
Secondary frame :
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.
Roof panel :
EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet
Wall panel :
Sandwich Panel or Corrugated Steel Sheet
Tie Rod:
Circular Steel Tube
Brace:
Round Bar
Knee Brace:
Angle Steel
Roof Gutter:
Color Steel Sheet
Drawing
We can make the design and quotation according to your require or your drawing
Certification
ISO9001:2000,AWS certified welder passport.

 

Trade Shows

Our Services
 

Henan Canglong steel structure company is one group in the collection of development, design, steel structure fabrication and installation, testing .Our company scope of business throughout  Southern China, southwest, North China, central China and other regions of Hong Kong and Macao, Southeast Asia, the Middle East, radiation, North America and other countries or regions, The product structure buildings include energy, traffic, covering building ships, nuclear power, wind power and other fields of steel structure residence.

Customers Visit

Packaging & Shipping

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

FAQ

1. Common type of the industrial building?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.

2. What's the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. 
How about the delivery time?
Reply: Usually,within 25-30 days after the order confirmed, also depends on the fabrication quantity.
4. 
How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure; 
manual derust St2.0 on secondary steel structure.
5. 
What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU.
6. 
How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede

7. Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

   Welcome you to ask our company questions and we would like to supply best service for you !