• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Henan, China (Mainland)
  • Brand Name: CangLong
  • Model Number: Prefabricated Warehouse
  • Application: Warehouse Construction Costs
  • Type: Prefabricated Steel Structure Warehouse
  • Certificate: ISO9001:2008/CE
  • Material: Q235B/Q345B
  • Surface: Anti-corrosive Paint
  • Column: Section Hot Rolled Welded
  • Purlin: C/Z Galvanized Steel(Q235)
  • Roof: Corrugrated Color Steel
  • Wall: Metsl Sheet
  • Installation: On-site Instruction

Packaging & Delivery

Packaging Details cost of warehouse construction use 20ft &40ft contianers to load , all materiasl will be bulked together .
Delivery Time Steel structure in 15-20days , sheets in 5 days .

Prefabricated steel structure low cost of warehouse construction

Our company workshop

Who Are We ?

  Thank you for your interest in Henan CangLong Steel Structures co,.ltd ,  We are a family owned business and have been in operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

  (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  (2)Any problems that arise are quickly dealt with to minimise any delays. 
  (3)Safety on site is also made a priority.

 

Production Flow

 

Detecting instrument

We often use Ultrasonic detector ,X-ray detector , Paint film thickness gauge to check steel frame .

       

Materials department

"Steel Design Code" (GB50017-2003)

 "Cold-formed steel structure technical specifications" (GB50018-2002)

 "Construction Quality Acceptance of Steel" (GB50205-2001)

 "Technical Specification for welded steel structure" (JGJ81-2002, J218-2002)

 "Technical Specification for Steel Structures of Tall Buildings" (JGJ99-9)

 

Construction calss

(1)Simple Steel Construction  

Main structure

Single span: L -shorter than 18m, H -lower than6m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet

Door

Wind resistance rolling door(within 10m2)

Window

Very few

Suitable market

No snow, wind load below 0.4kn/m2

 

(2)Standard Steel Construction  

Main structure

Single span: L -shorter than 24m, H -lower than8m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.5kn,wind loading below 0.5kn/m2

 

(3)Coastal(High Wind Speed)Steel Construction

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.7kn,wind loading below 1.2kn/m2

 

(4)Cold Region(Heavy Snow) Steel Construction  

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

PU foamed rolling door

Window

Alu. Alloy (can use with skylight)

Suitable market

snow loads below 3kn, wind load below 1KN/M2

 

(5)Steel Construction  with Crane(5T,10T,15T,20T)

Main structure

Single span: L -shorter than 20m, H -lower than 10 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door (within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow 0.5kn, wind load below 0.5kn/m2

Packaging & Shipping

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

 

 

Related Products

 

Buying Guides

1.Dimension :Length , width, height, eave height , roof pitch .

2.Doors and windows :dimension , quantity , where to put them.

3.Local climate : Wind speed , snow load ,etc

4.insulation material :sandwich panel or steel sheet

5.Crane beam :Do you need crane beam &tons? inside the steel structure or outside ?

6.Is there any materials that are not allowed to imported into the country where the structure is planning to use ?

7.What is the founctions of the workshop? we must consider the wind and lighting inside.

8.Pls send us your drawings if you have ready plan .

    Welcome you ask our company questions and we would like to supply best service for you !

   Contact ways : Ada Gao (Female) , Tel/Whatsapp/Viber: +86 15981850388

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
Trade Assurance
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
8 Transactions 700,000+
The supplier’s transactions conduted via Alibaba.com in the past 6 months.
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $198,000
Learn More