• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Henan, China (Mainland)
  • Brand Name: CangLong
  • Model Number: Steel Warehouse
  • Application: pre engineering prefabricated high rise steel structure building
  • Product name: pre engineering prefabricated high rise steel structure building
  • Material: Welded H steel or H beams
  • Type: Portal Frame
  • Purlin: C/Z Galvanized Steel(Q235)
  • Standard: China GB Standard
  • Roofing: sandwich panels or galvanizdd color sheets
  • Wall panels: Hot dipped Galvanized color sheets
  • Window: Plastic Steel Window
  • Door: Sliding Door or shutter

Packaging & Delivery

Packaging Details Packing by steel rod bar for Henan pre engineering prefabricated high rise steel structure building
Delivery Time 20 days for Henan pre engineering prefabricated high rise steel

Henan pre engineering prefabricated  high rise steel structure building

 

Our steel workshop

Who Are We ?

   We are professtional factory with operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,metal audio racks & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

  Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective

 and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced 

software we use.

Fast Delivery 

 (1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 (2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock 

position, weather etc).
Site Supervision 

  (1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  (2)Any problems that arise are quickly dealt with to minimise any delays. 
  (3)Safety on site is also made a priority.

 

Construction calss

(1)Simple Steel Construction  

Main structure

Single span: L -shorter than 18m, H -lower than6m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet

Door

Wind resistance rolling door(within 10m2)

Window

Very few

Suitable market

No snow, wind load below 0.4kn/m2

 

(2)Standard Steel Construction  

Main structure

Single span: L -shorter than 24m, H -lower than8m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.5kn,wind loading below 0.5kn/m2

 

(3)Coastal(High Wind Speed)Steel Construction

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door(within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow loading below 0.7kn,wind loading below 1.2kn/m2

 

(4)Cold Region(Heavy Snow) Steel Construction  

Main structure

Single span: L -shorter than 18m, H -lower than 6 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

PU foamed rolling door

Window

Alu. Alloy (can use with skylight)

Suitable market

snow loads below 3kn, wind load below 1KN/M2

 

(5)Steel Construction  with Crane(5T,10T,15T,20T)

Main structure

Single span: L -shorter than 20m, H -lower than 10 m

Maintenance system

Roof

Colored sheet with 50mm glass wool

Wall

Colored steel sheet or 50mm EPS sandwich board

Door

Wind resistance rolling door (within 15m2)

Window

Alu. Alloy (can use with skylight)

Suitable market

Snow 0.5kn, wind load below 0.5kn/m2

Production Flow

flat pack house cheap prefab cheap prefab steel metal audio rack procee to install condition:

1.Ground bolts plan :

 

2.Steel columns and steel beams connected :

 

 

3.Roofing and wall panels are caldding with steel frame

 

 

4. Accessories and ridge caldding .

 

Customers Visit

Steel structure metal audio rack,workshop,cold storage,Prebricated houses,frame houses,steel shed is our company main  products , they give high comments to our company qulity and service .

 

FAQ

1. Common type of the industrial steel structure building/Prefabricated house?

Reply: Portal frame is the usual type in the industrial workshop and metal audio rack shed. Other types also could be designed and manufacturer as per clients' request.

2. What's the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 
3. 
How about the delivery time?
Reply: Usually,within 20-25 days after the order confirmed, also depends on the order quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure or by Galvanized frame; 
manual derust St2.0 on secondary steel structure.
5. 
What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU sandwich panels.
6. 
How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no workteams , we can send our professtional teams to install for you.

7. Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

8. Prefabricated warehosue/workshop/Prefab house/Storage Life :

 Reply : All steel structure frame life is more than 50 Years , all caldding sheets are about 20 Years .

 

   Welcome you to send inquiry to our company NOW ,we would like to supply best service for you !

Contact : Ada Gao  Whatsapp/Viber/wechat: +86 15981850388

   

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
Trade Assurance
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
8 Transactions 700,000+
The supplier’s transactions conduted via Alibaba.com in the past 6 months.
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $198,000
Learn More